Epe – Agric Mini Water Works
| PROJECT: | Construction of Mini Waterworks at Epe/Agric in Epe Local Government Area  | 
| COUNTRY: | Nigeria | 
| CLIENT: | Lagos State Water Corporation (LSWC) | 
| DESCRIPTION: | Drilling of Four Deep Boreholes, Supply and Installation of Aeration/Sedimentation Tank, Filtration System, Booster Pumping System, Clear Water Tank (1000m3), Elevated Tank (225m3), Power Generation System, Operational Building and Pipeline Distribution System.  | 
| VALUE: | ₦457,363,149.50 ($2,817,146.61) | 
| STATUS: | Completed May, 2009. Commissioned February 2010. | 
